SERVICES
BESPOKEWEB APPS
I build the first real version, holding only what you need now.
WHAT IT COSTS
Internal tool €5000 – €35,000
MVP €9000 – €70,000
HOW LONG IT TAKES
6–16 weeksafter the scope is defined
The process has outgrown what a spreadsheet or an automation can hold. It needs users, roles, connected data and a round that stands up daily. Building the big version straight away is the slowest way to get there.
WHAT YOU END UP WITH
- Definition sprint: map, spec, priorities and estimate
- A first version holding only what you need now
- Main interfaces and authentication where needed
- Database and the priority step
- Deployment and checks on the real process
- Handover with documentation
HOW I BUILD IT
Understand the problem
I start from the definition sprint: problem, users, priority step, data sources and risks. Before writing code at full rate.
Define the perimeter
I settle what goes into the first version and what stays out. That decision is what makes a real delivery date possible.
Build
I build the main interfaces, the database and the priority step. With authentication where the data calls for it.
Make it maintainable
I hand over with checks, documentation and a handover session. The team uses it without waiting on me for every change.
WHAT IT IS NOT
It does not start without a written scope: the definition sprint is compulsory. And the first version is not a finished product: it holds what you need now, not everything imaginable.
WHERE I HAVE DONE IT

AI-generated image
FONDAZIONE STELION
public platform and project map
QUESTIONS
- Why is a definition sprint always required?
- Because apps and MVPs carry more variables — users, roles, data, integrations — than a first look shows. The sprint costs €800 to €2,000 and stops me building the wrong thing well.
- Do you work alone on something this size?
- Yes. Whoever hears the problem writes the code and hands it over. The flip side is capacity: I take few projects at a time and the dates are real, not optimistic.
- How long does it take?
- Usually 6 to 16 weeks after the scope is defined. The variable is how still the scope stays once we start.
Tell me which process has jammed.
Let's talkWHAT IT COSTS
Internal tool €5000 – €35,000
MVP €9000 – €70,000
HOW LONG IT TAKES
6–16 weeksafter the scope is defined

